It splits your expression on whitespace, insists on exactly five parts, and describes each part on its own line. That is the whole of it. It is a field-by-field translator, and understanding its limits is most of what you need to use it safely.
The most important limit comes first, because it decides whether the green status light means anything.
The status turns green as soon as there are five whitespace-separated parts. It performs no range checking whatsoever. Measured, every one of these reports OK in green:
99 99 99 99 99, described as “Minute: 99, Hour: 99” and so on, although minutes stop at 59 and hours at 23.x y z p q, described as “Minute: x, Hour: y”. Letters are passed straight through.0 0 32 * *, a 32nd day of the month.0 0 * 13 *, a thirteenth month.0 0 * * 8, an eighth day of the week.So a green OK on this page tells you your expression has the right shape. It tells you nothing about whether a scheduler will accept it or whether it will ever fire. Read the green light as “five fields found” and nothing more.
What it does reject is the wrong number of fields. An empty box, four fields, six fields, and the shorthand forms @daily and @reboot all produce “Need exactly 5 fields” in red. That rules out two common things: the six-field style used by Quartz and Spring, where the first field is seconds, and the @ shortcuts that Vixie cron supports. For reference, @daily is the same schedule as 0 0 * * *, @hourly is 0 * * * *, @weekly is 0 0 * * 0, @monthly is 0 0 1 * * and @yearly is 0 0 1 1 *. Any of those can be typed in longhand and this page will read it.
This is the single most expensive misreading in cron, and the output here does nothing to prevent it. Given 0 0 1 * 1 the page prints two independent lines, “Day of month: 1” and “Day of week: Mon (1)”, and almost everyone reads that as the first of the month, when it is a Monday.
It is the opposite. When both of those fields are restricted, cron fires when either matches. The POSIX specification puts it this way: “if either the month or day of month is specified as an element or list, and the day of week is also specified as an element or list, then any day matching either the month and day of month, or the day of week, shall be matched.” The Linux crontab manual gives the worked example: “If both fields are restricted (i.e., do not contain the "*" character), the command will be run when either field matches the current time. For example, "30 4 1,15 * 5" would cause a command to be run at 4:30 am on the 1st and 15th of each month, plus every Friday.”
So 0 0 1 * 1 runs on the first of every month and on every Monday, which is roughly five times a month rather than once or twice a year. If you want a genuine “first Monday”, standard cron cannot express it in one line. The usual answer is to schedule 0 0 1-7 * 1 and have the command itself check the date, or use a scheduler with extended syntax.
Four cases where the wording is misleading rather than merely terse. All measured on this page:
1-5/2 is described as “every 2 starting 1-5”. It actually means every second minute within the range 1 to 5, so minutes 1, 3 and 5. The description reads as though the range were a starting point.-1 is described as “from -1”, because the hyphen is taken for a range separator before anything checks whether the value is a number.*/0 becomes “every 0”, and 0-59/120 becomes “every 120 starting 0-59”, a step larger than the field it applies to.0 0 * JAN MON comes back as “Month: JAN” and “Day of week: MON”, with no month or weekday name attached, in either case. Real cron does accept these: the Linux manual says “Names can also be used for the 'month' and 'day of week' fields. Use the first three letters of the particular day or month (case does not matter). Ranges and lists of names are allowed.” So a valid expression gets a less useful description than a numeric one.The numeric forms it handles well. A plain number, a comma list such as 1,15, a simple */5 step and a bare * are all described accurately, and both 0 and 7 in the day-of-week field are correctly named as Sunday, which is a detail many explainers get wrong.
Several schedulers add characters that classic cron has no idea about, and because this page does not validate, they pass straight through looking as though they were understood. Measured, 0 0 L * * yields “Day of month: L”, 0 0 * * 5#3 yields “Day of week: 5#3”, and Jenkins-style H/15 yields “every 15 starting H”.
In the schedulers that support them, L means the last day, 5#3 means the third Friday of the month, and H means a value spread out by the scheduler to avoid everything firing at once. None of that is explained here, and none of it is valid in classic cron. The echo is not a translation.
Whitespace, at least, is forgiving. Leading and trailing spaces are ignored and runs of several spaces between fields are treated as one separator, so an expression copied out of a crontab with odd alignment still reads correctly.
@ shortcuts such as @daily or @reboot.@ shortcuts: crontab(5), Linux manual pages. man7.org/linux/man-pages/man5/crontab.5.htmlEvery behaviour and every value on this page was measured against this tool as it is published, in a browser, on 14 October 2026. Where the page says what the tool does not do, that is a statement about this tool, not about cron.
No. It means five whitespace-separated fields were found. No range is checked at all, so 99 99 99 99 99 and even x y z p q both report OK in green. Your scheduler will reject things this page accepts.
No, and this is the costly one. When both fields are restricted, cron runs when either matches, so 0 0 1 * 1 fires on the first of every month and on every Monday. The Linux manual's own example is that 30 4 1,15 * 5 runs on the 1st and 15th plus every Friday. Classic cron cannot express “first Monday” in one line.
This page will not tell you. It describes the pattern field by field and never computes a date. The actual next fire also depends on the scheduler's own time zone, which the expression does not carry.
Because it requires exactly five fields and @daily is one. The same applies to @reboot, @hourly, @weekly, @monthly and @yearly. Write the longhand instead: @daily is 0 0 * * *, @hourly is 0 * * * *, @weekly is 0 0 * * 0, @monthly is 0 0 1 * * and @yearly is 0 0 1 1 *.
Six-field expressions put seconds first and are used by Quartz, Spring and some other schedulers. This page only reads the classic five-field form, so drop the seconds field to get a description of the rest, and remember the seconds when you read the result.
Because the step is split off before the range is looked at, so the wording comes out backwards. It really means every second minute inside the range 1 to 5, which is minutes 1, 3 and 5. A plain */5 is described correctly.
No. Those are passed through untranslated, so 0 0 * JAN MON is described as “Month: JAN” and “Day of week: MON”. Cron itself does accept three-letter names in those two fields, case insensitively, including ranges and lists like jan-mar and mon,wed,fri. Use numbers here if you want a named description: 1 in the month field is shown as Jan.
They are echoed back, not understood. L, meaning the last day, and 5#3, meaning the third Friday, belong to Quartz-style schedulers, and H belongs to Jenkins. None is valid in classic cron, and seeing one repeated in the output is not a sign it was recognised.